Following work at 135 Bishopsgate, we were asked to take on the work at 155 Bishopsgate as well.
The work includes the design, supply and installation of a number of structural glazing and cladding elements plus powered retail doors, manual escape & bifold doors, internal draught lobby with powered sliding doors, internal door screens, a Fortiglaze fire door screen and a bespoke heritage entrance.
We have completed the Bishopsgate elevation, the three portal entrances, level 1 internal doors and ground floor Fortiglaze fire-rated doors, internal portal and draught lobby cladding panels.
Phase 2, which is along the Great Eastern Walkway began in November, includes double height curtain wall system using box profiles, blackened stainless steel panels and louvres, an automatic circular sliding door and automatic doors.
Watch our short video to see some of our work at 155 Bishopsgate:
Project Summary
- Location: 155 Bishopsgate, London
- Client: British Land
- Architect: Fletcher Priest
- Main Contractor: Overbury
- Status: Major Projects On-site
- Sectors: Office/Commercial, Retail
- Exterior/Interior: Interior/Exterior
- Expertise: Façades, Entrances, Fire Glazing