The Forge, 105 Sumner Street
Fire and non-fire rated glass doors and screens for the UK’s first Net Zero carbon commercial development
Fire and non-fire rated glass doors and screens for the UK’s first Net Zero carbon commercial development
Distinctive phosphor bronze canopy, brass windows and doors and internal glazing at Hyde Park Corner
Various glazing elements including both fire and non-fire-rated doors and screens; curtain walling and balustrades
100m glass canopy replacement over the main entrance
Various glazing elements including rooflights, entrance doors and balustrading
Refurbishment of the glazing to the existing ground and lower ground floors, and on floors 15 to 17
Installation of glass shop fronts at Four Quarters latest London arcade bar
Supply and installation on both upper and lower levels to the new shopfront for Uniqlo
Installation of 12 fire rated double doors with sidelights to the lift lobby and a 3-sided fire rated glazed atrium
Installation of the structural glass covered walkway, linking the newly refurbished and existing convents
Installation of Sika Tak adhered glass wall panels with black Vanceeva interlayer within the leisure centre
Split over 2 elevations, this corner grand reception entrance facade was originally raked out at the top
Installation of ballistic glazed screens in lift lobby and replacement of wall linings with colour-matched glass
Installation of a single glazed bespoke atrium screen
Replaced nearly 400 glass balustrade panels over 5 floors
Installed fire rated staircase and lift lobby screens and secondary steel work with fire encasement
Design and install bespoke EI120 fire rated screens with EI60 single door set meeting both line load and acoustic criteria
Refurbishment for the new Welcome Galleries exhibition space
Remodeled the main entrance, to provide an aesthetic and secure entrance system
Refurbishment consisting of black painted glass, structural steel, and exterior glazed & timber door sets
Worked primarily on the 3 basement levels, including the feature pool and jacuzzi at the very bottom of the house
Installation of a motorised Geeze double entrance door
Added extra security to the entrance by installing high glazed balustrading
Remove a previously installed shop front & replaced it with new low iron ESG glazing
We were asked to make alterations to an existing shop front to match the surrounding retail units
Feature screen installed above the Tormax glazed double automatic doors leading to the reception